3800TY Aqua-feed Line
Design Flow Chart
Project Machine List
3800T/YEAR AQUA-FEED LINE
Serial Name Model Quantity Power(KW) Note
single total
1、pulverizing process
101 discharging pit、grizzly
1


102 elevator TDTG36/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
103 pulverizing-pending silo 1cbm 1


104 Feeding cleaning sieve TWCZ18 1 1.10 1.10 Speed Control
105 magnetic plate
1

Stainless steel, high magnetic
106 broad hanmer mill SFSP65×38 1 37.0 37.00 Hammer milling, uniform particle size distribution Φ1.2 sieve
107 cyclone air locker 1


108 air locker GFZ9 1 0.75 0.75
109 simple pulse dust collector TBLMY26-2000 1

Innovative and efficient dust removal equipment
110 high pressure fan 9-26NO4.5A 1 7.50 7.50
111 air locker GFZ5 1 0.55 0.55

subtotal


48.40
2、Mixing process
201 discharging pit、grizzly
1


202 elevator TDTG36/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
203 Permanent magnet cylinder TCXT20 1


204 mixing-pending silo 1cbm 1


205 pneumatic valve TZMQ40×40 1


206 screw mixer SLHY.1 1 11.00 11.00 Mechanical equipment through the National Fisheries Quality Supervision and Inspection Center, mixing soft, short, high uniformity. Small electric door
207 small material adding hopper
1


208 pneumatic valve TZMQ25×25 1


209 buffer silo
1


210 screw conveyor TLSS20 1 2.20 2.20

subtotal


14.70
3、pelleting process
301 elevator TDTG36/23 1 2.20 2.20 Non-return means four sides engaging process, rigidity
302 magnetic device
1

Stainless steel, high magnetic
303 pneumatic three-way valve TZMQ2×25/45 1


304 pelleting-pending silo 23 1


305 upper material positioner
1


306 lower material positioner
1



manual plugboard
1


307 feed auger equipped with SZLH30b2 1 0.55 0.55 Speed Control Feeding
conditioner equipped with SZLH30b2 2 2.20 4.40 heat preservation double-jacketed conditioner
pellet mill SZLH30b2 1 30.00 30.00 Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed.
308 air-locked feeder
1 0.55 0.55

counter-flow cooler SKLN1.5 1 1.10 1.10 Octagonal structure, no dead cooling
309 discharger
1


310 air locker GFZ.7 1 0.75 0.75
311 fan 4-72N04A 1 5.50 5.50

subtotal


45.05
4、packing process of final product
401 elevator TDTG36/18 1 1.50 1.50 Non-return means four sides engaging process, rigidity
402 crumbler SSLG15×100 1 5.50 5.50 Fine tooth broken, broken uniform size
403 rotary sifter SFJH80×2d 1 1.10 1.10
404 pneumatic three-way valve TZMQ2×25/45 1


405 final production silo
2

A material silo, a granule silos, manual packing
406 manual bufferfly valve
2



subtotal


8.10
5、assisting process
501 fan 4-72No4A 1 5.50 5.50
502 pulse jet dust collector TBLMFa.30(1500) 1

Imported electromagnetic valve, 4 cylinder extraction
503 air locker GFZ.5 1 0.55 0.55
504 air compressor
1 7.50 7.50
505 air dryer
1


506 gas tank
1



container rack
1



subtotal


13.55

Total


129.80
Electric Control
prices of complete set of feed equipment
Project Name:3800t/year aqua-feed complete unit (∮4mm particles 1-2T / H)
Quote number:
Construction unit:
Serial
Name
Note
1、mechanical equipment (see equipment list)
2、electronic control system
1
centralized control cabinet
2
Cables, wires, trunking, standard tray, and other supporting materials
3
Site control cabinet
3、container unit material
1
Suction, dust removal and cooling ventilation network system
4-72No3.6A
1.0
4.0
4.0
2
Feed pipe, a small rack, platform, pipeline materials and other non-standard items
3
Standard parts, seals, and other solder pieces supporting material
SCY80
1.0
0.8
0.8
4
Pneumatic components and air compressor accessories
5
Paint (refers to the equipment up painting abroad reassembled)
6
Steam piping system
Steam piping installation drawings and configuration checklist
4, design fees
free
5, container chassis setup fee (refers prefabricated assembly factory in China)
6, foreign on-site guidance of installation and commissioning costs
Foreign engineers to guide installation and commissioning of US $ 80 per day per person
7, unforeseeable expenses
free
8, expedition charges
9, staff training costs
free
Electric Control
Note:
1、packaging and transportation costs are not included in the total price of the equipment
3, site lifting, installation tools and supplies owned by the user
2. This price is valid for MONTHS.
4, all site personnel expenses borne out by the demand side