| 1800T/YEAR AQUA-FEED LINE | ||||||
|---|---|---|---|---|---|---|
| Serial | Name | Model | Quantity | Power(KW) | Note | |
| single | total | |||||
| 1、pulverizing process | ||||||
| 101 | discharging pit、grizzly | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 102 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity | 
| 103 | pulverizing-pending silo | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 
				 | 
			manual plugboard | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 104 | screw conveyor | TLSS16 | 1 | 1.10 | 1.10 | Frequency Control | 
| 105 | magnetic plate | 
				 | 
			1 | 
				 | 
			
				 | 
			Stainless steel, high magnetic | 
| 106 | hammer mill | SFSP65*38 | 1 | 22.0 | 22.00 | Hammer milling, uniform particle size distribution Φ1.2 sieve | 
| 107 | cyclone | Φ650 | 1 | 
				 | 
			
				 | 
			
				 | 
		
| 108 | air locker | GFZ7 | 1 | 0.75 | 0.75 | 
				 | 
		
| 109 | high pressure fan | 9-26NO4A | 1 | 5.50 | 5.50 | 
				 | 
		
| 110 | simple pulse dust collector | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 111 | air locker | GFZ5 | 1 | 0.55 | 0.55 | 
				 | 
		
| 
				 | 
			subtotal | 
				 | 
			
				 | 
			
				 | 
			31.40 | 
				 | 
		
| 2、Mixing process | ||||||
| 201 | discharging pit、grizzly | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 202 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity | 
| 203 | mixing-pending silo | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 204 | pneumatic valve | TZMQ32*2 | 1 | 
				 | 
			
				 | 
			
				 | 
		
| 205 | mixer | SLHY0.4 | 1 | 5.5+0.37 | 5.87 | Mechanical equipment through the National Fisheries Quality Supervision and Inspection Center, mixing soft, short, high uniformity. Small electric door | 
| 206 | small material adding hopper | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 207 | penumatic valve | TZMQ25×25 | 1 | 
				 | 
			
				 | 
			
				 | 
		
| 208 | buffer silo | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 209 | screw conveyor | TLSS16 | 1 | 1.10 | 1.10 | 
				 | 
		
| 
				 | 
			subtotal | 
				 | 
			
				 | 
			
				 | 
			8.47 | 
				 | 
		
| 3、pelleting process | ||||||
| 301 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity | 
| 302 | magnetic device | 
				 | 
			1 | 
				 | 
			
				 | 
			Stainless steel, high magnetic | 
| 303 | bilateral screw conveyor | TLSS16 | 1 | 1.10 | 1.10 | 
				 | 
		
| 304 | pelleting-pending silo | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 
				 | 
			manual plugboard | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 305 | feed auger | SZLH30b2 | 1 | 0.55 | 0.55 | Speed Control Feeding | 
| conditioner | SZLH30b2 | 2 | 2.20 | 4.40 | heat preservation double-jacketed conditioner | |
| pellet mill | SZLH30b2 | 1 | 22.00 | 22.00 | Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed. | |
| 306 | air-locked feeder | 
				 | 
			1 | 0.55 | 0.55 | 
				 | 
		
| counter-flow cooler | SKL1.5 | 1 | 0.75 | 0.75 | Octagonal structure, no dead cooling | |
| 307 | fan | 4-72NO4A | 1 | 5.50 | 5.50 | Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed. | 
| 308 | discharger | Φ650 | 1 | 
				 | 
			
				 | 
			
				 | 
		
| 309 | air locker | GFZ.5 | 1 | 0.55 | 0.55 | 
				 | 
		
| 
				 | 
			subtotal | 
				 | 
			
				 | 
			
				 | 
			36.90 | 
				 | 
		
| 4、packing process of final product | ||||||
| 401 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity | 
| 402 | vibratory screen | SFJZ80×1 | 1 | 0.2×2 | 0.40 | Without cooler | 
| 403 | final production silo | 
				 | 
			2 | 
				 | 
			
				 | 
			A material silo, a granule silos, manual packing | 
| 404 | manual bufferfly valve | 
				 | 
			3 | 
				 | 
			
				 | 
			
				 | 
		
| 
				 | 
			subtotal | 
				 | 
			
				 | 
			
				 | 
			1.90 | 
				 | 
		
| 5、assisting process | ||||||
| 501 | fan | 4-72No4A | 1 | 5.50 | 5.50 | 
				 | 
		
| 502 | pulse jet dust collector | TBLMFa.28(1500) | 1 | 
				 | 
			
				 | 
			Imported electromagnetic valve, 4 cylinder extraction | 
| 503 | air locker | GFZ.5 | 1 | 0.55 | 0.55 | 
				 | 
		
| 504 | air compressor | 
				 | 
			1 | 7.50 | 5.50 | 
				 | 
		
| 505 | air dryer | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 506 | gas tank | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 
				 | 
			container rack | 
				 | 
			1 | 
				 | 
			
				 | 
			
				 | 
		
| 
				 | 
			total | 
				 | 
			
				 | 
			
				 | 
			11.55 | 
				 | 
		
| 
				 | 
			total | 
				 | 
			
				 | 
			
				 | 
			90.22 | 
				 | 
		
| 
					 
						prices of complete set of aqua-feed equipment
					 
				 | 
			||||||||||||
| 
					 
						Project Name: 1800t/year aqua-feed line(∮3mm particles 0.8-1.5T / H)
					 
				 | 
				
					 
						Quote number:
					 
				 | 
			|||||||||||
| 
					 
						Construction unit:
					 
				 | 
			||||||||||||
| 
					 
						Serial
					 
				 | 
				
					 
						Name
					 
				 | 
				
					 
						Note
					 
				 | 
			||||||||||
| 
					 
						1、mechanical equipment (see equipment list) 
					 
				 | 
			||||||||||||
| 
					 
						2、electronic control system 
					 
				 | 
			||||||||||||
| 
					 
						1
					 
				 | 
				
					 
						centralized control cabinet
					 
				 | 
			|||||||||||
| 
					 
						2
					 
				 | 
				
					 
						Cables, wires, trunking, standard tray, and other supporting materials
					 
				 | 
			|||||||||||
| 
					 
						3
					 
				 | 
				
					 
						Site control cabinet
					 
				 | 
			|||||||||||
| 
					 
						3、container unit material 
					 
				 | 
			||||||||||||
| 
					 
						1
					 
				 | 
				
					 
						Suction, dust removal and cooling ventilation network system
					 
				 | 
			|||||||||||
| 
					 
						2
					 
				 | 
				
					 
						Feed pipe, a small rack, platform, pipeline materials and other non-standard items
					 
				 | 
			|||||||||||
| 
					 
						3
					 
				 | 
				
					 
						Standard parts, seals, and other solder pieces supporting material
					 
				 | 
			|||||||||||
| 
					 
						4
					 
				 | 
				
					 
						Pneumatic components and air compressor accessories
					 
				 | 
			|||||||||||
| 
					 
						5
					 
				 | 
				
					 
						Paint (refers to the equipment up painting abroad reassembled)
					 
				 | 
			|||||||||||
| 
					 
						6
					 
				 | 
				
					 
						Steam piping system
					 
				 | 
				
					 
						Steam piping installation drawings and configuration checklist
					 
				 | 
			||||||||||
| 
					 
						4, design fees 
					 
				 | 
				
					 
						free
					 
				 | 
			|||||||||||
| 
					 
						5, container chassis setup fee (refers prefabricated assembly factory in China) 
					 
				 | 
			||||||||||||
| 
					 
						6, foreign on-site guidance of installation and commissioning costs 
					 
				 | 
				
					 
						Foreign engineers to guide installation and commissioning of US $ 80 per day per person
					 
				 | 
			|||||||||||
| 
					 
						7, unforeseeable expenses 
					 
				 | 
				
					 
						free
					 
				 | 
			|||||||||||
| 
					 
						8, expedition charges 
					 
				 | 
			||||||||||||
| 
					 
						9, staff training costs 
					 
				 | 
				
					 
						free
					 
				 | 
			|||||||||||
| 
					 
						Electric Control
					 
				 | 
			||||||||||||
| 
					 
						Note:
					 
				 | 
				
					 
						1、packaging and transportation costs are not included in the total price of the equipment
					 
				 | 
				
					 
						3, site lifting, installation tools and supplies owned by the user
					 
				 | 
			||||||||||
| 
					 
						2. This price is valid for MONTHS.
					 
				 | 
				
					 
						4, all site personnel expenses borne out by the demand side
					 
				 | 
			|||||||||||