| 1800T/YEAR AQUA-FEED LINE | ||||||
|---|---|---|---|---|---|---|
| Serial | Name | Model | Quantity | Power(KW) | Note | |
| single | total | |||||
| 1、pulverizing process | ||||||
| 101 | discharging pit、grizzly |
|
1 |
|
|
|
| 102 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity |
| 103 | pulverizing-pending silo |
|
1 |
|
|
|
|
|
manual plugboard |
|
1 |
|
|
|
| 104 | screw conveyor | TLSS16 | 1 | 1.10 | 1.10 | Frequency Control |
| 105 | magnetic plate |
|
1 |
|
|
Stainless steel, high magnetic |
| 106 | hammer mill | SFSP65*38 | 1 | 22.0 | 22.00 | Hammer milling, uniform particle size distribution Φ1.2 sieve |
| 107 | cyclone | Φ650 | 1 |
|
|
|
| 108 | air locker | GFZ7 | 1 | 0.75 | 0.75 |
|
| 109 | high pressure fan | 9-26NO4A | 1 | 5.50 | 5.50 |
|
| 110 | simple pulse dust collector |
|
1 |
|
|
|
| 111 | air locker | GFZ5 | 1 | 0.55 | 0.55 |
|
|
|
subtotal |
|
|
|
31.40 |
|
| 2、Mixing process | ||||||
| 201 | discharging pit、grizzly |
|
1 |
|
|
|
| 202 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity |
| 203 | mixing-pending silo |
|
1 |
|
|
|
| 204 | pneumatic valve | TZMQ32*2 | 1 |
|
|
|
| 205 | mixer | SLHY0.4 | 1 | 5.5+0.37 | 5.87 | Mechanical equipment through the National Fisheries Quality Supervision and Inspection Center, mixing soft, short, high uniformity. Small electric door |
| 206 | small material adding hopper |
|
1 |
|
|
|
| 207 | penumatic valve | TZMQ25×25 | 1 |
|
|
|
| 208 | buffer silo |
|
1 |
|
|
|
| 209 | screw conveyor | TLSS16 | 1 | 1.10 | 1.10 |
|
|
|
subtotal |
|
|
|
8.47 |
|
| 3、pelleting process | ||||||
| 301 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity |
| 302 | magnetic device |
|
1 |
|
|
Stainless steel, high magnetic |
| 303 | bilateral screw conveyor | TLSS16 | 1 | 1.10 | 1.10 |
|
| 304 | pelleting-pending silo |
|
1 |
|
|
|
|
|
manual plugboard |
|
1 |
|
|
|
| 305 | feed auger | SZLH30b2 | 1 | 0.55 | 0.55 | Speed Control Feeding |
| conditioner | SZLH30b2 | 2 | 2.20 | 4.40 | heat preservation double-jacketed conditioner | |
| pellet mill | SZLH30b2 | 1 | 22.00 | 22.00 | Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed. | |
| 306 | air-locked feeder |
|
1 | 0.55 | 0.55 |
|
| counter-flow cooler | SKL1.5 | 1 | 0.75 | 0.75 | Octagonal structure, no dead cooling | |
| 307 | fan | 4-72NO4A | 1 | 5.50 | 5.50 | Gear transmission, low vibration, high transmission efficiency; high yield, produce better quality feed. |
| 308 | discharger | Φ650 | 1 |
|
|
|
| 309 | air locker | GFZ.5 | 1 | 0.55 | 0.55 |
|
|
|
subtotal |
|
|
|
36.90 |
|
| 4、packing process of final product | ||||||
| 401 | elevator | TDTG26/18 | 1 | 1.50 | 1.50 | Non-return means four sides engaging process, rigidity |
| 402 | vibratory screen | SFJZ80×1 | 1 | 0.2×2 | 0.40 | Without cooler |
| 403 | final production silo |
|
2 |
|
|
A material silo, a granule silos, manual packing |
| 404 | manual bufferfly valve |
|
3 |
|
|
|
|
|
subtotal |
|
|
|
1.90 |
|
| 5、assisting process | ||||||
| 501 | fan | 4-72No4A | 1 | 5.50 | 5.50 |
|
| 502 | pulse jet dust collector | TBLMFa.28(1500) | 1 |
|
|
Imported electromagnetic valve, 4 cylinder extraction |
| 503 | air locker | GFZ.5 | 1 | 0.55 | 0.55 |
|
| 504 | air compressor |
|
1 | 7.50 | 5.50 |
|
| 505 | air dryer |
|
1 |
|
|
|
| 506 | gas tank |
|
1 |
|
|
|
|
|
container rack |
|
1 |
|
|
|
|
|
total |
|
|
|
11.55 |
|
|
|
total |
|
|
|
90.22 |
|
|
prices of complete set of aqua-feed equipment
|
||||||||||||
|
Project Name: 1800t/year aqua-feed line(∮3mm particles 0.8-1.5T / H)
|
Quote number:
|
|||||||||||
|
Construction unit:
|
||||||||||||
|
Serial
|
Name
|
Note
|
||||||||||
|
1、mechanical equipment (see equipment list)
|
||||||||||||
|
2、electronic control system
|
||||||||||||
|
1
|
centralized control cabinet
|
|||||||||||
|
2
|
Cables, wires, trunking, standard tray, and other supporting materials
|
|||||||||||
|
3
|
Site control cabinet
|
|||||||||||
|
3、container unit material
|
||||||||||||
|
1
|
Suction, dust removal and cooling ventilation network system
|
|||||||||||
|
2
|
Feed pipe, a small rack, platform, pipeline materials and other non-standard items
|
|||||||||||
|
3
|
Standard parts, seals, and other solder pieces supporting material
|
|||||||||||
|
4
|
Pneumatic components and air compressor accessories
|
|||||||||||
|
5
|
Paint (refers to the equipment up painting abroad reassembled)
|
|||||||||||
|
6
|
Steam piping system
|
Steam piping installation drawings and configuration checklist
|
||||||||||
|
4, design fees
|
free
|
|||||||||||
|
5, container chassis setup fee (refers prefabricated assembly factory in China)
|
||||||||||||
|
6, foreign on-site guidance of installation and commissioning costs
|
Foreign engineers to guide installation and commissioning of US $ 80 per day per person
|
|||||||||||
|
7, unforeseeable expenses
|
free
|
|||||||||||
|
8, expedition charges
|
||||||||||||
|
9, staff training costs
|
free
|
|||||||||||
|
Electric Control
|
||||||||||||
|
Note:
|
1、packaging and transportation costs are not included in the total price of the equipment
|
3, site lifting, installation tools and supplies owned by the user
|
||||||||||
|
2. This price is valid for MONTHS.
|
4, all site personnel expenses borne out by the demand side
|
|||||||||||